Más ideas de Paula
Los paneles de GRC se realizaron sobre moldes de goma con un dibujo de estrías verticales desordenadas

sede judicial Antequera, Tectonica Los paneles de GRC se realizaron sobre moldes de goma con un dibujo de estrías verticales desordenadas

QUERFELDEINS (2015): Neues Wohnen in Chorweiler Nord, Köln (DE), via competitionline.com

QUERFELDEINS (2015): Neues Wohnen in Chorweiler Nord, Köln (DE), via competitionline.com

<3

Detalles Constructivos, Detalles De La Arquitectura, Revit Architecture, Techos Verdes, Planos De Construcción, Ladrillos, Detalles, Brick Construction, Roof Flashing, Brick Detail, Details Magazine, Constructive Details, Details

Rain Garden Collaborating with Sherwood Design Engineers, site drainage was integrated early into the architecture and landscape design. Seasonal rains are managed onsite through multiple rain gardens which collect and control storm water runoff from the roof, decks, and pool terrace. This system decreases on site erosion and possible flooding to the city’s drainage downstream from the project site.

Rain Garden Collaborating with Sherwood Design Engineers, site drainage was integrated early into the architecture and landscape design. Seasonal rains are managed onsite through multiple rain gardens which collect and control storm water runoff from the roof, decks, and pool terrace. This system decreases on site erosion and possible flooding to the city’s drainage downstream from the project site.